Vena Energy has chosen Offshore Design Engineering (ODE) as the owner’s engineer of the developer’s Yokji offshore wind farm project in South Korea. The plant will have a capacity of 384MW.
The contract with ODE will cover a period of two years, with services as basic engineering, support to wind turbines generations (WTG), and support to engineering, procurement and construction (EPC) included.
These activities will be carried out through ODE’s offices in London and Seoul.
Yokji is set to start production in 2026. South Korea intends to have a national offshore wind capacity of 12GW by the end of the decade.
For more information please visit EICDataStream.