Karoon Energy has advanced the Neon oil development in Brazil's Santos Basin to the front-end engineering design (FEED) phase.
To support the technical configuration, Karoon has signed a memorandum of understanding with TechnipFMC for subsea engineering and procurement planning. Furthermore, the operator secured an exclusivity agreement with Altera Infrastructure to evaluate the deployment and refurbishment of the Piranema Spirit floating production, storage and offloading (FPSO) vessel.
The optimised first phase reduces estimated initial capital expenditure to between US$800m and US$950m. Targeting a final investment decision in 2027, the initial scope includes three production wells and one gas injection well, expected to yield up to 30,000 barrels per day by 2030.
This staggered development model limits early financial exposure while providing vital reservoir data to support future offshore expansion across the wider basin.
Track more details on the Neon Project directly on EICDataStream.