Directory

Events

EU Tenders








Frequently Asked Questions
Contact Us

British Standards Received December 2005

Copies of BSI papers listed in this section may be obtained from the Council

Please contact Parvez Butt, Technical Director
Tel. 020 7221 2043
Fax. 020 7221 8813

For further information please visit the British Standards Institution website at.... www.bsi-global.com

BS EN 14399-1:2005
Hugh-strength structural bolting assemblies for preloading – Part 1: General Requirements

BS EN 14399-2:2005
Hugh-strength structural bolting assemblies for preloading – Part 2: Suitability test for preloading

BS EN 14399-3:2005
Hugh-strength structural bolting assemblies for preloading – Part 3: System HR – Hexagon bolt and nut assemblies

BS EN 14399-4:2005
Hugh-strength structural bolting assemblies for preloading – Part 4: System HV – Hexagon bolt and nut assemblies

BS EN 14399-5:2005
Hugh-strength structural bolting assemblies for preloading – Part 5: Plain washers

BS ISO 11237-1:2004
Rubber hoses and hose assemblies – Wire-braid-reinforced compact types for hydraulic applications – Specification – Part 1: Oil-based fluid applications

BS EN 14420-1:2004
Hose fittings with clamp units – Part 1: Requirements, survey, designation and testing

BS EN 14420-2:2004
Hose fittings with clamp units – Part 2: Hose side parts of hose tail

BS EN 14420-3:2004
Hose fittings with clamp units – Part 3: Clamp units, bolted or pinned

BS EN 14420-4:2004
Hose fittings with clamp units – Part 4: Flange connections

BS EN 14420-5:2004
Hose fittings with clamp units – Part 5: Threaded connections

BS EN 14420-6:2004
Hose fittings with clamp units – Part 6: TW tank truck couplings

BS EN 14420-7:2004
Hose fittings with clamp units – Part 7: Cam locking couplings

BS EN 14420-8:2004
Hose fittings with clamp units – Part 8: Symmetrical half coupling (Guillemin system)

BS 6231:1998
Specification for PVC-insulated cables for switchgear and controlgear wiring

BS EN 54-13:2005
Fire detection and fire alarm systems – Part 13: Compatibility assessment of system components

BS 7775:2005
Penstocks for use in water and other liquid flow applications – Specification

BS EN 10226-3:2005
Pipe threads where pressure-tight joints are made on the threads – Part 3: Verification by means of limit gauges

BS EN 13483:2005
Rubber and plastic hoses and hose assemblies with internal vapour recovery for measured fuel dispensing systems – Specification

BS EN 1360:2005
Rubber and plastic hoses and hose assemblies for measured fuel dispensing systems – Specification

BS 7910:2005
Guide to methods for assessing the acceptability of flaws in metallic structures

BS EN 14424:2004
House fittings with screwed ferrules

BS EN ISO 9000:2005
Quality management systems – Fundamentals and vocabulary

BS 7540-1:2005
Electric cables – Guide to use for cables with a rated voltage not exceeding 450/750 V – Part 1: General guidance

BS 7540-2:2005
Electric cables – Guide to use for cables with a rated voltage not exceeding 450/750 V – Part 2: Harmonized cable types from HD 21 and HD 22

BS 7540-3:2005
Electric cables – Guide to use for cables with a rated voltage not exceeding 450/750 V – Part 3: National standard cables not included in HD 21 and HD 22

Service Level Summary

The table below gives a brief outline of the new BSI service levels. For more detailed information, please contact Customer Services at BSI on 020 8996 7250

What BSI provides free

Enhanced

Full

Assisted

Basic

Dormant

E-Committee system

*

*

*

*

*

System for considering new work

*

*

*

*

*

Training

*

*

*

*

*

Maintains central records

*

*

*

*

*

Five year reviews

*

*

*

*

*

Procedural advice

*

*

*

*

*

Committee support team

 

 

 

*

*

Access to committee rooms

*

*

*

*

 

Manages votes

*

*

*

*

 

Circulates documentation

*

*

*

*

 

Dedicated Programme Manager (PM)

*

*

*

 

 

PM co-ordinates responses to technical queries

*

*

*

 

 

Marketing support from Business Information

*

*

*

 

 

PM attends committee meetings

*

*

 

 

 

PM prepares meeting agendas

*

*

 

 

 

PM takes meeting minutes

*

*

 

 

 

PM supports UK delegations, as justified

*

*

 

 

 

Proactive promotion

*

 

 

 

 

PM attends and speaks at industry events

*

 

 

 

 

Presentations on the work of the committee

*

 

 

 

 

 

Back to Technical News Index


Top of Page

Energizing Your Business